2CV Rebuild 7

Uncategorized

Last night I encountered a “that’s not very good” moment. The last 2 bits to strip from inside the car that go through the bulkhead were the clutch pedal assembly and steering column. Photos show that I have been driving the car for the last couple of years with a dangerously faulty column, only about 1/4 of the spline’s area has been doing any actual work in the steering!

Related Posts

Uncategorized

2CV Rebuild 8

“Houston we have lift off!” Well I thought this was going to be awkward, and I haven’t dropped…
2CV Rebuild 6
2CV Rebuild 8
Menu