2CV Rebuild 6

Uncategorized
A little less active last weekend, but have started to remove all the fittings that go through the bulkhead prior to lifting the body clear of the chassis.. I’ve got the brake master cylinder, clutch cable and steering still to do, which I’ll do this week.

Related Posts

Uncategorized

2CV Rebuild 18

This weekend spent painting the underneath of the body with POR15 bedliner, a chip resistant rubberised paint, see http://www.holden.co.uk/displayproduct.asp?pCode=097.991,…
VSCC Exmoor Trial
2CV Rebuild 7
Menu