Tiger Tales 3……

Stories

Now that the Tiger has been stripped of anything remotely mechanical, it is time for distribution of these major parts to the relevant specialist for rebuild. To this end, Jeremy has loaded the heart of the beast onto the van and taken it to Knight Racing Services (www.knightracingservices.co.uk) who are going to give it a thorough rebuild.

 

Loading the engine onto the HVC van
Loading the engine onto the HVC van
Peter Knight consulting his book of words to work out what on earth has just been left in his workshop!
Peter Knight consulting his book of words to work out what on earth has just been left in his workshop!

At the same time, the shell has been given some temporary and really quite fetching colour-coded wheels to allow it to be moved out of the workshop to allow the bodywork to commence.

Shell rolls out of the workshop
Shell rolls out of the workshop
Tiger shell on its winter wheels!
Tiger shell on its winter wheels!

Related Posts

Stories

2CV Rebuild 7

Last night I encountered a “that’s not very good” moment. The last 2 bits to strip from inside…
Austin 7 Gordon England
Car Club Invitation
Menu