2CV Rebuild 20

Stories

The Body is now fully fixed to the chassis. Pedals are back in and connected up and working, I bled the brakes through without a hitch….much to my relief, as all new pipework has been installed.

Pedals

The car now needs to be rewired, I’ve kept the rear loom as that was all OK, and the wires in the front cross bar that supports the headlamps. I can’t continue with this job as I need the new dashboard to be sprayed prior to installing all the new toggle switches and extra instruments. A temporary circuit has been made to try the engine after 12 months inactivity, and the engine started first go!!!

Headlamp

Gear Lever linkage has had new rubber bushes, the hand brake a new plastic bulkhead connecting fitting (this was a sod to do and I destroyed the first on and had to reorder from ECAS)

I’ve cleaned all the doors and exposed the rot that needs to be fixed by Russell, also on one of the front doors the rubber trim grip was rotten, so I’ve ordered a repair section and cut the old one off. I used our Bilt-Hamber rust removal system to clean, and I was very impressed with the result.

Door Top Door Bottom The rear door rubbers are OK but one of the front door rubbers needs replacing. The doors, rear wings, door hinges, front triangular panels, and dashboard will go to Russell for spraying on Monday.

I’m using our 5 3/4″ chrome freestanding lights as I don’t like the plastic Citroen ones, steel ones would have been used if available as my light units are new and have the advantage of dipping to the left or right by the simple bulb position adjustment, and of course I intend to take the car to France……I wonder if it will be its first time (mine is a Portuguese made car)?

Related Posts

Stories

2CV Rebuild 5

  Last night’s activity was to take the wiring out of the car. It’s relatively easy to remove…
Stories

2CV Rebuild 11

Firstly I had to clear some blocks left over from some building work I’ve been doing last year,…
2CV Rebuild 19
2CV Rebuild 21
Menu