Posts by Holden News

Gaugepilot Review

An excellent review of Gaugepilot recently published in TKC magazine. See TKC_scan_May2016_rfs to read the full review.

2CV Rebuild 21

The white plastic brake rod bulkhead fitting First wiring diagram…this is all new toggle switches on the dash with additional functions  The re wrapped original rear wiring loom…note where it…

2CV Rebuild 20

The Body is now fully fixed to the chassis. Pedals are back in and connected up and working, I bled the brakes through without a hitch….much to my relief, as…

2CV Rebuild 19

Last night Adam and Simon helped take the body off the wooden support horses and put it back on the chassis. I had, the previous night, prepped all the chassis…

2CV Rebuild 18

This weekend spent painting the underneath of the body with POR15 bedliner, a chip resistant rubberised paint, see http://www.holden.co.uk/displayproduct.asp?pCode=097.991, As this is water based I had to have a couple of…

2CV Rebuild 17

June – since my last blog seems a long time ago! Well here’s the excuses:- Firstly I Had to finish off a hall way and lay the flooring and do…

Gauge Pilot Newsletter

Welcome to GaugePilot newsletter 6. As autumn arrives here in the UK we are busy preparing for the Classic Car Show at the Birmingham NEC and have been supporting our customers on La Carrera…

2CV Rebuild 16

Work is now progressing at a blistering pace – to the extent that the floors and front repair panel are now in place, the A post repair has been done,…
Menu